Does roof evaporation cool the rooms?
Building comfort, not just roof temperature
Circulate stored rainwater across an appropriate roof surface during hot weather, then compare with matched periods without cooling.
Our animations show what a smart rainwater system could do. A real pilot should tell us what it actually does: inside a building, during storms, on solar panels—and in the maintenance budget.
A single building can host roof cooling and stormwater tests. A small, independent two-panel installation can test photovoltaic cooling without waiting for the perfect roof.
We need a place where differences can be measured—not just observed by eye.
The perfect house is not a prerequisite for every experiment. The PV comparison can be done separately, at ground level, with identical panel orientation and unshaded exposure.
Building comfort, not just roof temperature
Circulate stored rainwater across an appropriate roof surface during hot weather, then compare with matched periods without cooling.
Retention, release and safe operation
Observe rainfall entering the tank, forecast-driven preparation, controlled release, and any overflow. Test what happens when forecasts or connectivity fail.
Two identical panels, one cooled
Put two comparable photovoltaic panels side by side, as cheaply as practical. Cool one with rainwater; monitor both over sunny periods and across a season.
Reliability, surprises and maintenance
Count the things a simulation misses: installation complications, clogged lines, sensor failures, software interruptions, cleaning, repairs and human effort.
Before any cooling, collect untreated roof, indoor, outdoor and PV data. Verify sensor agreement and water-meter accuracy.
Alternate cooled and uncooled periods under comparable conditions. For PV, use simultaneous paired panels and swap treatment if feasible.
Log forecasts, actual rain, tank levels, releases, connectivity outages, recovery behavior and any maintenance work.
Report measurements, uncertainty, costs, deposits, and limitations after a meaningful monitoring period. No preselected success claim.
Roof wetting must be assessed for waterproofing, roofing materials, runoff hygiene, freeze risk and safe access. Any PV wetting must be compatible with the modules and electrical safety requirements. Sewer discharge requires approved routes and limits; simulated green/red signals are not utility authorization. Room-to-room temperature differences alone do not prove causality without appropriate controls. A season of visual observation is not a certified long-term durability test.
The goal isn't to demonstrate that every hypothesis is correct. It's to discover which benefits are real, what installation conditions make sense, and what must change before this can scale.
One host building. Four independently testable questions. Practical evidence for the next decision.